Pryer

Project Overview

Project Description:

Removal of wooden planks nailed and screwed to rafters.
Removal of fibre from entire roof.
Install of SF19+.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2024-01-10
Project Ended: 2024-01-10
Project Size: 45
Project Location: Epsom

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks