Project Description:

Removal of old insulation, 9 bags of fibreglass.
Lay on new 100mm bottom layer insulation.
Installation of SF40, 100m2.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2024-01-15
Project Ended: 2024-01-15
Project Size: 100
Project Location: Carshalton