16 Lake Terrace

Project Overview

Project Description:

Installing room in roof system design on the Social Housing Decarbonisation Fund (SHDF)

Key Details:

Project Installed By: Insulation Direct Ltd
Project Began: 2024-03-28
Project Ended: 2024-04-05
Project Size: 25
Project Location: Leeds

Project Gallery:

Insulation Direct Ltd

Insulation Direct Ltd

Enable Notifications OK No thanks