Donoghue

Project Overview

Project Description:

SF19+ Thermal Foil
installation, removal of old
insulation, replenish with
10mm bottom layer mineral
wool and wood treatment
application

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2024-05-13
Project Ended: 2024-05-14
Project Size: 85
Project Location: East Sussex

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks