22 Shrewsbury Road

Project Overview

Project Description:

Timber frame extension i have built, used the superfoil on all internal walls and vaulted ceiling, and on the underside of the warm roof.

Key Details:

Project Installed By: Property Snagging Services LTD
Project Began: 2024-02-01
Project Ended: 2024-06-07
Project Size: 192
Project Location: Church Stretton

Enable Notifications OK No thanks