Mrs Fraser

Project Overview

Project Description:

60m2 with Foam block removal and relaying of existing insulation and then install superfoil insulation.

Key Details:

Project Installed By:
Project Began: 2025-02-06
Project Ended: 2025-02-07
Project Size: 60
Project Location: Birmingham

Project Gallery:

Enable Notifications OK No thanks