Mr Andy Ormston

Project Overview

Project Description:

50m2 SF FOIL
STORAGE REMOVAL
2m2 MEMBRANE
20 LIGHT CAGES
LAP VENTS
MOULD SPRAY
50m SF19+
Large Storage removal
2m membrane repair
LV
TT
20down light covers

Key Details:

Project Installed By:
Project Began: 2026-04-07
Project Ended: 2026-04-07
Project Size: 50
Project Location: Swindon

Enable Notifications OK No thanks