Susan Marshall
July 23, 2026
Project Overview
Project Description:
Move a few stored items to the middle of the loft.
Apply anti-fungal treatment.
Install Multi-Foil (SuperFOIL SF19+).
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-07-23
Project Ended: 2026-07-23
Project Size: -1
Project Location: Cranleigh
