Ray Hill
July 25, 2026
Project Overview
Project Description:
Remove open cell foam, applied to breathable membrane
Supply and fit SF19+ to 50 SQM in 2 small loft areas that were fully boarded
Key Details:
Project Installed By: Insulation installed and removed
Project Began: 2026-05-02
Project Ended: 2026-05-07
Project Size: 0
Project Location: Stroud
