Project Overview
Project Description:
Remove all debris and fibreglass prior to installation
Timber baton steel roof structure for fixing foil by stapling
Install 80sqm of SF19+
Fix to timber wall plate staples and mastic to seal, lap and tape all joints etc.
Finished job with base roll to hide a ridiculous amount of wiring and pip work as per instructions from builder
Key Details:
Project Installed By: Insulation installed and removed
Project Began: 2025-12-03
Project Ended: 2025-12-09
Project Size: 80
Project Location: Evesham