Janet Stenning

Project Overview

Project Description:

Supply and install SuperFOIL SF19+ multi-foil insulation.
Install insulation to 2 sides of the loft.
Loft area: Approximately 50m².
Apply anti-fungal treatment to affected areas within the loft.
Move a small number of customer belongings as required to facilitate the installation.
Complete the installation in 1 working day.
Leave the work area clean and tidy upon completion.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-07
Project Ended: 2026-08-07
Project Size: 50
Project Location: Swindon

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks