Rogan Tweeddale

Project Overview

Project Description:

• Remove the existing fibreglass insulation from floor (either side of boarding)
• Supply and install 100mm floor insulation to 25m² around the boarded area (not under the boarding).
• Apply anti-fungal treatment to the roof rafters.
• Supply and install SuperFOIL SF19 with 50m² net coverage.
• Storage removal

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-19
Project Ended: 2026-08-19
Project Size: 50
Project Location: Lambourn

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd