Philip Noak
August 21, 2026
Project Overview
Project Description:
Toxic Fibreglass removal and disposal
82 Air vents installed as he had bitumen felt
SuperFOIL SF40 installed
100mm Knauf on floor
Key Details:
Project Installed By: Warm lofts
Project Began: 2026-08-18
Project Ended: 2026-08-18
Project Size: 104
Project Location: Barrow in Furness
