Andy Evelin

Project Overview

Project Description:

Superfoil Install
Remove fibreglass
Wood Treatment
remove items from loft and put them back up after we have installed the superfoil

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-09-02
Project Ended: 2026-09-04
Project Size: 60
Project Location: Fareham

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks