Project Overview

Project Description:

Coverage: Approx. 50 m²
* Supply and install SuperFOIL SF19+ to approximately 50 m² of the pitched roof area.
* Install foil across the two agreed roof sides.
* Carry out the installation in accordance with manufacturer requirements.
* Ensure the loft area and existing flooring/boarding are protected during installation.
* Complete the works within approximately 1 day.
* Remove installation debris and waste from the work area.
* Leave the property and surrounding work areas clean and tidy on completion.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-09-16
Project Ended: 2026-09-16
Project Size: 50
Project Location: Streetly