Beswick

Project Overview

Project Description:

Installation of SF19+ insulation.
Removal of old insulation.
Replenish with new bottom layer, 100mm floor insulation.
Flea bomb to kill flies in the loft.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2024-03-28
Project Ended: 2024-03-28
Project Size: 90
Project Location: Scottow,

Project Gallery: