Chris Wykes
April 8, 2026
Project Overview
Project Description:
Removal of existing materials
Remove and dispose of all existing loft insulation, boarding and stored items from the loft area.
Loft insulation installation
Install 100mm mineral wool insulation across the loft floor area.
SuperFOIL insulation
Install SuperFOIL insulation to the pitched sections of the loft in accordance with manufacturer guidelines.
Loft boarding
Install new loft boards fixed directly to the top of the existing floor joists.
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-03-25
Project Ended: 2026-03-27
Project Size: 60
Project Location: Slough
