David Henderson

Project Overview

Project Description:

SuperFOIL SF19 installation
Removal of existing insulation
Rockwool slab insulation installation
Resize the loft hatch
Supply and fit a new insulated loft hatch

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-25
Project Ended: 2026-08-25
Project Size: 21
Project Location: London

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks