Guy Williams
March 4, 2026
Project Overview
Project Description:
Removal of existing insulation
Remove and dispose of existing loft insulation from accessible areas.
Loft insulation
Supply and install 100mm mineral wool loft insulation across loft areas.
Eaves insulation
Install SuperFOIL insulation to both eaves areas.
Ensure insulation is fitted in accordance with manufacturer guidelines and loft ventilation is maintained.
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-02-24
Project Ended: 2026-02-24
Project Size: 14
Project Location: London
