Matthew Evans
September 25, 2026
Project Overview
Project Description:
Full loft clean
Fibreglass removal
board removal
Superfoil SF40
100mm Knauf to perimeter
Evo board
Job done as per superfoil spec and U-values
document will be enclosed
ridge was only 1.4 m high
Key Details:
Project Installed By: Warm lofts
Project Began: 2026-09-22
Project Ended: 2026-09-24
Project Size: 100
Project Location: Liversage