Neil and Andy

Project Overview

Project Description:

Town house with really poor EPC with limited access to inspection and surveyor has made assumptions simply because they’re lazy and would not climb over and inspect.
Upper rooms have been extremely hot this summer and a radiant barrier was asked for
In hindsight I should have used a SF radiant barrier
However the customer wanted a more substantial barrier and mineral wool
Because of the structure it was impossible to fully seal and for this reason( a trickle airflow from eaves we went ahead. We also put boards and a ladder in

Key Details:

Project Installed By: Insulation installed and removed
Project Began: 2026-09-30
Project Ended: 2026-09-30
Project Size: 38
Project Location: Cirencester