Peter Squire
August 13, 2026
Project Overview
Project Description:
Airing cupboard insulation
Install SuperFOIL SF19+
2 sides to be foiled
Approx. 6.18m × 2.96m loft
Includes timber treatment
Loft is not empty and has existing flooring
Fitted floor boarding and ladder are present
General roof condition: OK
Damp reading: 15%
1 day to complete
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-12
Project Ended: 2026-08-12
Project Size: 52
Project Location: Ox14 2lz
