Steve reroof of the kitchen

Project Overview

Project Description:

36 tiles up from eve to ridge
Lenght 8.2
width 3.6
replace 25% of tiles renew guttering to length
Super FOIL insulation and felt plus lath
lead work
Could od with U value and condesantion risk report,
Specification of SuperFOIl to fufil regs and aplication methodology for roofer.

Key Details:

Project Installed By: Noreus Ltd
Project Began: 2024-04-02
Project Ended: 2024-05-22
Project Size: 35.42
Project Location: Stoke on Trent