SUSAN HIGGINS

Project Overview

Project Description:

75m2 superFOIL
REMOVE 3m2 FIBRE FROM EAVES
REMOVE 25m2 BOARDS
STORAGE REMOVAL
45m2 NEW BOARDS
LOFT HATCH
LOFT LADDER
HOOVER LOFT

Key Details:

Project Installed By: U.K. Energy Saving Network Ltd
Project Began: 2025-10-06
Project Ended: 2025-10-09
Project Size: 75
Project Location: LONDON