Teresa Crawford
August 27, 2026
Project Overview
Project Description:
Supply and install 87m² of SF19 SuperFOIL insulation across 4 sides and 2 lofts.
Carry out minor centralisation of items within the loft/attic area where required.
Fit insulation neatly around existing timbers, lights, flooring, boarding, pipework, and other obstructions.
Maintain suitable ventilation to minimise condensation and moisture build-up.
Complete final checks and leave the work area clean and tidy.
Wood treatment
Estimated duration: 1–2 days.
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-25
Project Ended: 2026-08-26
Project Size: 87
Project Location: Reading