ANDREW OGILVIE

Project Overview

Project Description:

50m2 FOIL
RELOCATE LOFT HATCH IF POSSIBLE
4m2 NEW BOARDS
MOULD SPRAY

Key Details:

Project Installed By: U.K. Energy Saving Network Ltd
Project Began: 2025-10-07
Project Ended: 2025-10-07
Project Size: 50
Project Location: LONDON

Project Gallery:

Enable Notifications OK No thanks