Aranda

Project Overview

Project Description:

Installation of SF19+.
Removal of old fibre and replenish with new 100mm bottom layer insulation in between floor joists.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2024-01-22
Project Ended: 2024-01-22
Project Size: 60
Project Location: Sholing

Project Gallery:

Safe Eco-Fixes Ltd

Safe Eco-Fixes Ltd

Enable Notifications OK No thanks