Martin Craven

Project Overview

Project Description:

Remove all old fibreglass and debris. Remove old water tanks.
Install boards to rafters thru the centre of the loft.
Fit SF19+ to sloping ceilings down the eaves. Install lap vents to insure adequate ventilation to roof structure. Install 48 sqm of SF19+ throughout. Tape and seal to wall plate. Redirect bathroom extraction fan thru a roof vent. Fit ladder and shelves for storage

Key Details:

Project Installed By: Insulation installed and removed
Project Began: 2026-08-24
Project Ended: 2026-08-26
Project Size: 48
Project Location: Warwickshire

Enable Notifications OK No thanks