Project Description:

Apply Anti-Fungal treatment to the loft area.
Supply and install Multi-Foil to approximately 50m² of loft area.
Loft measurement from floor joist to ridge is approximately 2m.
Ensure the Multi-Foil is properly fitted and secured throughout the designated loft area.
Leave the loft area clean and tidy upon completion.

Key Details:

Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-09-07
Project Ended: 2026-09-07
Project Size: 50
Project Location: Tadley