Robert Woodford
August 19, 2026
Project Overview
Project Description:
Remove fibreglass from rafters
Superfoil Install
Wood treatment
moving items from the loft downstairs
Approx. 50 m² to be foiled.
2 sides to foil.
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-08-14
Project Ended: 2026-08-14
Project Size: 50
Project Location: Byfleet
