Rosemary Gray
September 29, 2026
Project Overview
Project Description:
Remove and safely replace belongings from the loft area as required.
Apply anti-fungal treatment to the loft area.
Supply and install Multi-Foil insulation across approximately 40m².
Complete the works across the two roof sides.
Ensure the loft area is left clean and tidy upon completion.
Key Details:
Project Installed By: Safe Eco-Fixes Ltd
Project Began: 2026-09-28
Project Ended: 2026-09-28
Project Size: 40
Project Location: St Albans