Theo Wells
By Jonathan Rowley |
Remove remnants of foam from the eaves. Supply and install MultiFoil 60m² to the agreed areas. Carry out the works over an estimated 1–2 days. Existing loft is empty with no loft flooring or boarding. General roof condition is OK. Damp was found, with a damp reading of 13. Remove all waste generated during the […]
Read More 